POS terminal repair, refurbishment, and lifecycle management across three Reconext facilities. This page provides the complete data collection playbook for deploying the multi-modal AI optimization loop on the Verifone program.
High-volume processing facility near the US-Mexico border. Handles bulk POS terminal intake, testing, and component-level repair with cross-border logistics integration.
Central Mexico operations hub supporting Verifone device refurbishment, quality assurance, and regional distribution for the Latin American market.
US-based facility managing Verifone program coordination, advanced diagnostics, customer-facing quality gates, and North American fulfillment.
Complete this checklist for EACH of the three Verifone sites. Every item must be completed before the AI model can begin processing.
Copy this exact folder structure for each site. The AI model expects this consistent organization to cross-reference data across modalities.
π Verifone/
π Reynosa/
π 01_Spatial/
π matterport_scan_{DATE}.e57
π matterport_web_link.txt
π floor_plan_annotated.pdf
π 02_Video/
π receiving/
π test_stations/
π repair_benches/
π cosmetic_grading/
π packaging_shipping/
π establishing_shots/
π video_index.xlsx
π 03_Plus_IFS_Data/
π raw_exports/
π aggregated/
π data_dictionary.xlsx
π mcp_config.json
π 04_Audio/
π {AREA}_{DATE}_{TIME}.wav
π 05_Equipment_Labor/
π equipment/
π labor/
π financial/
π 06_Enrichment/
π boms/
π spec_sheets/
π work_instructions/
π quality_standards/
π collection_checklist.xlsx
π README.md
π Mexico_City/
π (same structure as Reynosa)
π Grapevine_TX/
π (same structure as Reynosa)Execute this sprint at each site. The Dream Team travels to each facility and completes all data collection within 7 business days.
What each Dream Team member specifically does for the Verifone data collection and optimization deployment.
Mitigation: Ensure data is stored on compliant cloud storage; verify no PII in video captures; use encrypted transfer
Mitigation: Data Capture Specialist validates field consistency across all three sites before extraction
Mitigation: Operations Analyst coordinates with site managers to schedule during normal production volume
Mitigation: Engineering Lead cross-references Plus SKU list against collected BOMs; flags gaps immediately